Sunday, 21 April 2013

Week 14: FYP 2: Complete final year project report and presentation day

Title:Complete final year project report and presentation day

Objective: 1)To complete the report of final year project
          2) To show and present the result final year project to assessor

Contents and procedure:

(1) Discuss with lecturer in term of final year project presentation and report
(2) Research internet what are include in final year project report.
(3) Follow guideline in RPS about the format

Result and analysis :
Figure 1: Greenhouse picture
Development of humidity control & automatic greenhouse watering system is design to control and maintain the condition in a greenhouse like temperature, humidity and lighting. This project also used the water pump to water the chili plants in a greenhouse. All the system in a greenhouse is control by the PIC16F877A microcontroller. Consumers can always setting the time when the plant need water. Besides that, they never have to drag a hose all over the plant, never have to try and figure out if they applied enough (or too much) water, and never have to worry about watering the plant while away. The system is automatic; consumer does not have to be there to physically apply the water. They have more free time to enjoy more of your favorite activities.


Conclusion:
As for the conclusion, in order to achieve the objective of this project, the knowledge of each part of the project such as sensor,  PIC circuit, programming that using C programming as the source code of programming and microcontroller PIC16F877A as the main hardware, need to research more. This system use the subject such as microcontroller & interfacing as the source of information in order to understand the concept, theory, problem and solution of this project

No comments:

Post a Comment